Loading…
Loading…
Practical insights on energy, building automation, and compliance for buildings and industry, by the Cobler team.
Industry GuidesMalaysia now ties DESAC tax incentives to design PUE of 1.4/1.6/1.7 under the MIDA guideline. What the targets mean, how ISO/IEC 30134-2 measurement works, and why annualized PUE in a tropical climate is an operations problem.
Industry GuidesHalf a mall's electricity runs through the chiller plant, and one festive Saturday half-hour sets the RP4 demand charge. A practical guide for Malaysian mall operators: load split, tenant billing, the measure stack, BEI benchmarks and EECA.
Industry GuidesWhere a Malaysian hotel's energy really goes and how to cut it without touching guest comfort: chiller share, room setbacks, RP4 demand peaks, ToU fit, EECA and a real Marriott retrofit.