CommercialFeaturedA Kuala Lumpur mall and office building brings its sub-metered energy data into live dashboards, scheduled reports and real-time maximum demand monitoring with CobiNeural.
ManufacturingFeaturedMosca's strapping plant in Ulu Tiram, Johor uses CobiNeural for real-time energy monitoring, a monthly energy report built from live data, and alerts when equipment behaves abnormally.
CommercialFeaturedCobler delivered the BMS, on an MRCB-led project, for the district cooling plant that cools EPF HQ, Malaysia's largest fund manager, tuning the chilled water plant to 0.7 kW/RT efficiency.
HospitalityFeaturedCobler retrofitted a Marriott hotel's ACMV. New variable speed drives cut maximum demand by about 3.2% and energy by about 4.9%, a broken BMS was centralized, and weak cooling was traced to a duct leak and over-designed air handling.
WarehouseStorio's automated hub at Elmina runs mainly on motor load, not lighting, so maximum demand drives its bill. Digital power meters feeding CobiNeural support demand attribution, GBI NRNC Silver evidence and a 24% energy reduction target. Completing October 2026.
HospitalityA 211-room Melaka hotel is metering its function hall so events can be billed on actual energy used, and capturing a chiller baseline before replacement. Delivered with Cape Renewables Sdn Bhd, completing October 2026.
CommercialOngoing project: Cobler is deploying CobiNeural energy and water monitoring at EVCC Pedas RSA, Malaysia's first privately operated highway Rest and Service Area, which pairs a Shell fuel station with a 350 kW EV charging corridor.
OthersCobler built DBKL's Low Carbon Building Checklist (LCBC) portal, with IEN and C40 Cities. It makes low-carbon design a mandatory, automated check for every building submission in Kuala Lumpur.
OthersCobler built the GreenRE CRMS, replacing manual spreadsheet tracking with one platform that runs the whole certification process, making green building certification faster and easier across Malaysia and the region.