RetailFeaturedCobler advised Mid Valley Megamall on optimising its central chiller plant from the buildings own BMS data, tuning control and sequencing rather than replacing equipment.
CommercialFeaturedA mixed-use mall and office in Kuala Lumpur consolidates sub-metered energy data into live dashboards, automated reports, and real-time maximum-demand monitoring with CobiNeural.
ManufacturingFeaturedMosca's state-of-the-art strapping facility in Ulu Tiram, Johor uses CobiNeural for real-time energy monitoring, faster monthly reporting, and plant-floor anomaly detection.
CommercialFeaturedCobler delivered the BMS — on an MRCB-led project — for the district cooling plant that cools EPF HQ, Malaysia’s largest fund manager, tuning the chilled water plant to 0.7 kW/RT efficiency.
HospitalityFeaturedCobler retrofitted a Marriott hotel’s ACMV — VSDs cut maximum demand ~3.2% and energy ~4.9% — centralized a broken BMS, and traced weak cooling to a duct leak and over-designed air handling.
WarehouseStorio's automated hub at Elmina runs on motor load, not lighting, which makes maximum demand the bill. Digital power meters feeding CobiNeural support demand attribution, GBI NRNC Silver evidence and a 24% energy reduction target. Completing October 2026.
HospitalityA 211-room Melaka hotel is metering its function hall so events can be billed on actual energy used, and capturing a chiller baseline before replacement. Delivered with Cape Renewables Sdn Bhd, completing October 2026.
CommercialCobler monitors energy and water with CobiNeural at EVCC Pedas RSA, Malaysia's first privately operated highway Rest and Service Area, which pairs a Shell fuel station with a 350 kW EV charging corridor.
OthersCobler built DBKL's Low Carbon Building Checklist (LCBC) portal, with IEN and C40 Cities - making low-carbon design a mandatory, automated check for every building submission in Kuala Lumpur.