Mid Valley Megamall main entrance and signage, Kuala Lumpur
RetailFeatured

Mid Valley Megamall: Chiller Plant BMS Advisory

Cobler advised Mid Valley Megamall on optimising its central chiller plant from the buildings own BMS data, tuning control and sequencing rather than replacing equipment.

Mid Valley MegamallRead
Great Eastern Mall & Office
CommercialFeatured

Great Eastern Mall & Office: Sub-Metering and Centralised Energy Reporting

A mixed-use mall and office in Kuala Lumpur consolidates sub-metered energy data into live dashboards, automated reports, and real-time maximum-demand monitoring with CobiNeural.

Great Eastern Mall & OfficeRead
Mosca production facility in Ulu Tiram, Johor, Malaysia
ManufacturingFeatured

Mosca Malaysia: Energy Monitoring & Monthly Reporting

Mosca's state-of-the-art strapping facility in Ulu Tiram, Johor uses CobiNeural for real-time energy monitoring, faster monthly reporting, and plant-floor anomaly detection.

Mosca (MGM Sdn. Bhd.)Read
EPF headquarters building served by its district cooling plant in Kuala Lumpur
CommercialFeatured

EPF HQ District Cooling: BMS Control to 0.7 kW/RT

Cobler delivered the BMS — on an MRCB-led project — for the district cooling plant that cools EPF HQ, Malaysia’s largest fund manager, tuning the chilled water plant to 0.7 kW/RT efficiency.

EPF HQ District Cooling PlantRead
Marriott Hotel
HospitalityFeatured

Marriott Hotel: ACMV Retrofit with VSDs and a Centralized BMS

Cobler retrofitted a Marriott hotel’s ACMV — VSDs cut maximum demand ~3.2% and energy ~4.9% — centralized a broken BMS, and traced weak cooling to a duct leak and over-designed air handling.

Marriott HotelRead
Exio Logistics Hub at Elmina East, Storio Hub 1 and Hub 2, with loading docks and trucks
Warehouse

Storio Elmina: Digital Power Meters for an Automated Warehouse

Storio's automated hub at Elmina runs on motor load, not lighting, which makes maximum demand the bill. Digital power meters feeding CobiNeural support demand attribution, GBI NRNC Silver evidence and a 24% energy reduction target. Completing October 2026.

StorioRead
Rooftop pool deck at Grand Swiss-Belhotel Melaka
Hospitality

Grand Swiss-Belhotel Melaka: Digital Power Meters for EMS

A 211-room Melaka hotel is metering its function hall so events can be billed on actual energy used, and capturing a chiller baseline before replacement. Delivered with Cape Renewables Sdn Bhd, completing October 2026.

Grand Swiss-Belhotel MelakaRead
EVCC Pedas RSA aerial render with Shell fuel station and EV charging hub
Commercial

EVCC Pedas RSA: Energy and Water Monitoring at a Landmark Highway Hub

Cobler monitors energy and water with CobiNeural at EVCC Pedas RSA, Malaysia's first privately operated highway Rest and Service Area, which pairs a Shell fuel station with a 350 kW EV charging corridor.

EVCC Pedas RSARead
The LCBC low-carbon building portal homepage, built for DBKL Kuala Lumpur
Others

LCBC: Low-Carbon Compliance for Every Kuala Lumpur Building

Cobler built DBKL's Low Carbon Building Checklist (LCBC) portal, with IEN and C40 Cities - making low-carbon design a mandatory, automated check for every building submission in Kuala Lumpur.

DBKLRead
Case Studies | Cobler