HealthcareFeaturedGleneagles monitors voltage sags and swells in real time and routes instant WhatsApp alerts to the biomedical and facilities teams, adding a layer of protection for sensitive medical equipment.
CommercialCobler monitors energy and water with CobiNeural at EVCC Pedas RSA, Malaysia's first privately operated highway Rest and Service Area, which pairs a Shell fuel station with a 350 kW EV charging corridor.
OthersCobler built DBKL's Low Carbon Building Checklist (LCBC) portal, with IEN and C40 Cities - making low-carbon design a mandatory, automated check for every building submission in Kuala Lumpur.
OthersCobler built the GreenRE CRMS, replacing manual spreadsheet tracking with one platform that runs the whole certification lifecycle - making green building certification faster and easier across Malaysia and the region.
CommercialA mixed-use mall and office in Kuala Lumpur consolidates sub-metered energy data into live dashboards, automated reports, and real-time maximum-demand monitoring with CobiNeural.
RetailCobler retrofitted the chiller plant and AHU controls at Seremban Prima Mall so the building cools to demand, delivered around live trading hours.
ManufacturingMosca's state-of-the-art strapping facility in Ulu Tiram, Johor uses CobiNeural for real-time energy monitoring, faster monthly reporting, and plant-floor anomaly detection.
Commercial275 George Street, a commercial building in Australia, deployed CobiNeural for energy monitoring and sub-metering, turning a single supply point into a continuous, area- and system-level view of consumption.
ManufacturingCobler delivered the BMS for the chilled water plant at Otafuku’s Malaysian sauce manufacturing operation, running the plant to demand instead of flat out.