HospitalityFeaturedCobler retrofitted a Marriott hotel's ACMV. New variable speed drives cut maximum demand by about 3.2% and energy by about 4.9%, a broken BMS was centralized, and weak cooling was traced to a duct leak and over-designed air handling.
HospitalityA 211-room Melaka hotel is metering its function hall so events can be billed on actual energy used, and capturing a chiller baseline before replacement. Delivered with Cape Renewables Sdn Bhd, completing October 2026.