Blog

Practical insights on energy, building automation, and compliance for buildings and industry, by the Cobler team.

Genset Peak Shaving in Malaysia: Does It Pay? - illustration
TNB Bills & Tariffs

Genset Peak Shaving in Malaysia: Does It Pay?

Under TNB's RP4 tariff, every kW kept off your monthly peak interval is worth RM89.27 to RM97.06. Whether a standby genset can beat that depends on one number: how many hours a month it has to run.

Aug 26, 2026Read
Why Is Your TNB Bill So High? A Commercial Checklist - illustration
TNB Bills & Tariffs

Why Is Your TNB Bill So High? A Commercial Checklist

A Medium Voltage site peaking at 1,000 kW pays around RM89,270 a month in demand charges before any energy is billed. Nine common causes of a jumped commercial TNB bill, each with what to check on the bill and what to check in the building.

Aug 26, 2026Read
What Is Load Factor? The KPI Behind High TNB Bills - illustration
TNB Bills & Tariffs

What Is Load Factor? The KPI Behind High TNB Bills

Load factor tells you whether you are paying TNB for capacity you actually use or capacity you touch once a month. Here is the formula, a worked RP4 example where two identical-kWh sites sit RM26,781 apart, and how to raise it.

Aug 26, 2026Read
Connected Load vs Maximum Demand: What TNB Bills - illustration
TNB Bills & Tariffs

Connected Load vs Maximum Demand: What TNB Bills

Connected load is the sum of your nameplate ratings. Maximum demand is the highest 30-minute average your meter records, and it is the one TNB charges you for. Here is the difference, the demand factor that links them, and what it costs in ringgit.

Aug 26, 2026Read
DX vs Chilled Water: Which Cooling Fits Your Building? - illustration
HVAC & Chiller Plants

DX vs Chilled Water: Which Cooling Fits Your Building?

A practical decision guide for Malaysian buildings: where the size crossover between DX and chilled water actually sits, how the two compare on kW/RT, redundancy, space and lifecycle cost, and why one gets metered while the other fails quietly.

Aug 26, 2026Read
TNB Tariff Categories Explained (RP4 2025) - illustration
TNB Bills & Tariffs

TNB Tariff Categories Explained (RP4 2025)

On 1 July 2025 TNB retired the C1, C2, E1 and E2 letters and replaced them with voltage-based categories, each with a General or Time-of-Use option. Here is how the new TNB tariff categories work, where your old letter lands, and what the five bill components actually cost you.

Aug 26, 2026Read
Maximum Demand Monitoring: Catch Peaks Before the Bill - illustration
Energy Monitoring & Analytics

Maximum Demand Monitoring: Catch Peaks Before the Bill

Your TNB bill reports maximum demand weeks after the half-hour that caused it. Live maximum demand monitoring, a threshold set below the ceiling you are willing to pay for, and alerts that fire mid-interval give operators 10 to 15 minutes to act.

Aug 26, 2026Read
Solar Maximum Demand: Why Your kW Charge Stays - illustration
TNB Bills & Tariffs

Solar Maximum Demand: Why Your kW Charge Stays

Rooftop solar cuts kWh, but it rarely touches the maximum demand charge that TNB bills on a single 30-minute interval. Here is why, and what actually protects your kW line under RP4.

Aug 26, 2026Read
Row of power meter phasor screens, one fan of arrows collapsed and glowing amber among healthy ones, with a clamp meter beside the panel
Energy Monitoring & Analytics

Meter Installation Mistakes: A Field Checklist

A wrongly wired meter still talks to Modbus and fills a dashboard with plausible numbers. This field checklist catches the wiring errors in the data before you sign practical completion.

Jul 15, 2026Read
Blog — Page 5 | Cobler - Building Automation & Energy Management